Rapid commissioning
ATyS t and g switches offer significant time saving during commissioning (process takes 2 to 3 minutes). Thanks to the design that allows commissioning through just two potentiometers (4 on the ATyS g) and four DIP switches, a screwdriver is all that is required to configure the parameters. For added simplicity, they also offer an autoconfiguration function which enables automatic adjustment of the rated voltage and frequency.
ATyS t: specifically designed for mains/mains applications
The ATyS t integrated controller has been designed to provide only the functions required for these applications (operation with or without priority, preferred source selection) together with the monitoring of the voltage and frequency of both sources, for threephase and single-phase networks.
ATyS g: specifically designed for mains/ genset applications
The ATyS g integrated controller has been designed to provide specific functions for these applications (genset startup, on-load or off-load tests…) together with the monitoring of the voltage and frequency of both sources for three-phase and single-phase networks.